The project is located in Lingdingyang, Pearl River Estuary. The construction content is to maintain the water depth of the existing channel.

dredging maintenance - deers

The total length of the channel maintenance is 87.166 kilometers, and the total dredging volume is 2.6795 million cubic meters. The main maintenance and dredging sections are the FG section of the Lingding Estuary and the GN2 section of the public access channel in the Nansha operation area.

Related Products