Dredging for Passenger Port of Saint-Petersburg

About the project on construction of anchoring piles at Passenger Port of Saint-Petersburg, the company is planning dredging works at Berths No 6 and No 7.

The works will be performed by FSUE Rosmorport in 2018. The design is to be completed in 2016, the first phase (pre-dredging) will be implemented in 2017.

The project implementation will accommodate two 330-meter long vessels simultaneously.

Passenger Port of Saint-Petersburg?Marine Fade? PLC is in the ownership of the city of St. Petersburg and is the largest passenger seaport in Russia. Construction of Marine Fade began in 2006. The port can accommodate cruise and ferry ships of up to 330 m long and with a draft of up to 8.8 m. The length and depth of new access channels – 10 km and 11 m, accordingly. The port operates seven piers. The quayside length – 2,171.06 m.

The news is collated by Globaldredge.com – Dredging Pipeline Supplier.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *