A dredging project will begin at point Grey, Mandurah

It is reported that a dredging project will begin at point Grey,Mandurah.Maintenance dredging that will widen and restore safe navigation depths to the Point Grey Channel-the waterway linking the Peel Inlet.

“The $675,000 project will take three months to complete and see approximately 13,000 cubic meters of sand taken from the channel,” Mr Jenkins said. “The dredged material, to be pumped through a series of floating and submerged pipes, has been approved to be deposited in the Peel Inlet 600 meters north east of the eastern end of the channel.”

This project is significant to local area.An additional barge will also be located approximately 600 meters east of the Harvey Channel, connected to floating pipeline. This area will be delineated with yellow marker buoys, equipped with flashing yellow lights.

The news is collated by Globaldredge.com – Dredging Pipeline Supplier.

 

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *