Dredging Works at Swinoujscie
Tender Ref No: 000070-2018
Tender Details: Open Procedure
Work Profile: The execution of construction and dredging works based on this contract, in the following scope:
a)deepening of the Swinoujscie – Szczecin route to -12.5 m on the section about 62 km;
b)reconstruction of bank slopes without reinforcements;
c)leveling of the bottom in the Swinoujscie zone;
d)construction and reconstruction of bank fortifications and hydro-technical builds together with adjacent infrastructure;
e)reconstruction of colliding industry networks;
f)deepening and widening of ships’ turntables;
g)construction of additional hydrotechnical structures and other infrastructure; construction of new artificial-silting fields on the Szczecin Lagoon with marinas, adaptation and modernisation of the existing navigation markings.
Project Stage: Tenders Invited
Project Period: 51 Months
Area: Poland, Szczecin
Posted Dated: 03/01/2018
Tender Deadline: 27/02/2018 – 10:30 Hrs
Promoter: Dyrektor Urzedu Morskiego w Szczecinie, Plac Stefana Batorego 4, Szczecin, 70-207, Poland
Contact:
Monika Czajkowska
Tel: +48 914403423;
Fax: +48 914403441;
E-mail: zamowienia@ums.gov.pl
The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier.
Leave a Reply
Want to join the discussion?Feel free to contribute!