Maintenance Dredging of Kennebec River

Solicitation Number: W912WJ-17-B-0005

Notice Type: Solicitation

Work Description:
The work involves urgently needed dredging of two portions of the authorized, 27-foot deep, 500-foot wide FNP in the lower Kennebec River. Dredging would restore the channel to its authorized dimensions and involves removal of a total of about 70,000 cubic yards (cy) of clean sand. Approximately 50,000 cy of material will be removed from the Doubling Point area (i.e. just below Bath) and approximately 20,000 cy of material will be removed from the Popham Beach area (at the river mouth). The 50,000 cy to be removed from the channel at Doubling Point includes approximately 35,000 cy of advance maintenance dredging. Material dredged from the Doubling Point area will be placed in the previously used in-river disposal area north of Bluff Head in about 95-100 feet of water. Material dredged from the Popham Beach area will be placed in the previously used 500-yard diameter nearshore disposal area located about 0.4 nautical miles south of Jackknife Ledge and in about 40-50 feet of water.

Posted Date: March 29, 2017

Due Date: N/A

Nation: USA

Contracting Office Address:
696 Virginia Road
Concord, Massachusetts 01742-2751
United States

Primary Point of Contact.:
Julio Hall,
CONTRACT SPECIALIST
Julio.E.Hall@usace.army.mil
Phone: 9783188035

The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *