Maintenance Dredging of Wilmington Harbor

2017.03.21

Solicitation Number: W912PM-17-B-0001

Notice Type: Presolicitation

Work Description:
Maintenance dredging of the Federal navigation channel reaches includes Smith Island Channel and Baldhead Shoal Channel Reach 2. The dredging shall be accomplished by hydraulic cutter suction dredge and/or hopper dredge. Dredging depths are 44′ plus 2′ of allowable overdepth. The estimated quantity of material to be dredged is approximately 500,000 cubic yards. The dredged material shall be placed on the beach at Oak Island. All beach work is to be completed during the established environmental window of 16 November 2017 through 30 April 2018. The environmental window for hopper dredging is 1 December through 31 March. The work will include shaping the beach fill and pre and post construction beach surveys.

Posted Date: March 20, 2017

Due Date: March 31, 2018

Nation: USA

Contracting Office Address:
CESAW-CT, 69 Darlington Ave
Wilmington, North Carolina 28403-1343
United States

Primary Point of Contact.:
Rosalind Shoemaker
rosalind.m.shoemaker@usace.army.mil
Phone: 9102514436

The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *