Tender Details: Open Procedure. Reference No: 2017-00158
Profile: General dredging works to be carried out in 2018 in the harbour areas of Port of Barcelona.
Project Stage: Tenders Invited
Area: Spain, Barcelona
Dated: 04/05/2018
Promoter: Presidencia del Consejo de Administración de la Autoridad Portuaria de Barcelona, (Port de Barcelona), Q0867012G, Plaça del Portal de la Pau, 6, Barcelona, 08039, Spain
Contact: Presidencia del Consejo de Administración
The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier
https://www.globaldredge.com/wp-content/uploads/2018/05/0巴塞罗那_看图王.jpg200320adminhttps://www.globaldredge.com/wp-content/uploads/2020/07/deers-hose-logo.jpgadmin2018-05-18 01:58:412020-08-03 04:01:45Port dredging works in Barcelona
Work Profile: Best Value Dredging “Maren Noord Groningen”. Dredging programme 2018-2019, a number of water bodies are to be dredged, including Meedstermaar, Broekstermaar, Losdorpstermaar, etc. Works also include environmental management, maintaining contacts with the stakeholders and adjacent (receiving)owners.
The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier
https://www.globaldredge.com/wp-content/uploads/2018/05/荷兰_看图王.jpg200320adminhttps://www.globaldredge.com/wp-content/uploads/2020/07/deers-hose-logo.jpgadmin2018-05-16 02:52:522020-08-03 04:00:39Dredging works in Groningen ,Netherlands
Work Description:The work includes annual maintenance dredging for the Oakland Inner and Outer Harbor federal navigation channel in Alameda County. This project has a Base for the FY18 Dredge Cycle to dredge the Inner and Outer Harbor to -50-ft (MLLW) plus 1-ft of paid over-depth to be transported and placed at a Contractor-furnished permitted beneficial use upland site. This project includes two Alternative Options; Alternative Option 1 is for the FY19 Dredge Cycle dredging the Inner and Outer Harbor to -50-ft (MLLW) plus 1-ft of paid over-depth to be transported to the Government-furnished site SF-DODS. Alternative Option 2 is for the FY19 Dredge Cycle dredging the Inner and Outer Harbor to -50-ft (MLLW) plus 1-ft of paid over- depth with transportation and placement at a Contractor-furnished beneficial use upland site.
Posted Date:May 8, 2018
Archive Date:-
Nation: the U.S.
Contracting Authority: Department of the Army U.S. Army Corps of Engineers
Contracting Office Address:ATTN: CECT-SPN 1455 MARKET ST., 17TH FL San Francisco, California 94103-1398 United States
Point of Contact(s):James E Garror, Contract Specialist James.E.Garror@usace.army.mil
Phone: 415/ 503-6988
Fax: 415/ 503-6694
The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier
https://www.globaldredge.com/wp-content/uploads/2018/05/0000000000000_看图王.jpg200320adminhttps://www.globaldredge.com/wp-content/uploads/2020/07/deers-hose-logo.jpgadmin2018-05-14 01:42:152020-08-03 03:59:23Harbor channel maintenance dredging project in Oakland
Tender Details: Open Procedure. Reference 000 – NPEQ2434
Work Profile: Macduff and Stonehaven Harbour Dredging Campaigns. Aberdeenshire Council is looking to carry out annual dredge campaigns in Macduff and Stonehaven harbours in conjunction with the existing licence for Macduff (runs until Feb 2019) and also the existing licence for Stonehaven (runs until July 2020), and the proposed subsequent renewals. Note: To register your interest and obtain additional information, please visit the PCS website at: https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=540061
The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier
https://www.globaldredge.com/wp-content/uploads/2018/05/66-5_看图王.jpg200320adminhttps://www.globaldredge.com/wp-content/uploads/2020/07/deers-hose-logo.jpgadmin2018-05-03 02:33:182020-08-03 06:06:52Maintenance Dredging Works in UK, Aberdeen
Work Description:Baltimore Harbor & York Spit VA Channel. It is anticipated the work would be performed in the Fall-Winter of 2018-2019. The project consists of dredging portions of the York Spit Federal Navigation Channel. The work consists of maintenance dredging to a required depth of 51 feet MLLW with one foot of allowable overdepth. The dredging involves approximately 1,500,000 to 2,000,000 cubic yards of material, including allowable overdepth dredging. The work shall be performed by a clamshell dredge and scow with all dredged material transported and placed in the designated Government-furnished placement area at Wolf Trap Alternative Placement Site. A large portion of the work may be performed during the winter months when weather conditions are most severe. Work will also be accomplished in a heavy commercial waterway supporting the Port of Baltimore. The equipment required for this work commonly consists of one or two 40 plus cubic yard clamshell dredges, several large tugs, several 2,500 – 5,000 cubic yard bottom dump material scows, and appropriate attendant plant.
Posted Date:April 23, 2018
Due/Archive Date:May 22, 2018
Nation: the U.S.
Contracting Authority:Department of the Army,U.S. Army Corps of Engineers
Contracting Office Address:2 Hopkins Plaza Baltimore, Maryland 21201
United States
Point of Contact(s):David Potocek Contract Specialist
David.M.Potocek@usace.army.mil
Phone: 410-962-1725
The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier
https://www.globaldredge.com/wp-content/uploads/2018/04/00巴尔的摩_看图王.jpg200320adminhttps://www.globaldredge.com/wp-content/uploads/2020/07/deers-hose-logo.jpgadmin2018-04-25 02:26:392020-08-03 06:07:56The Dredging Maintenance in Baltimore Harbor & York Spit VA Channel
Work Description:The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of portions of the Newark Bay, New Jersey Federal Navigation Project. The dredged material would be processed and subsequently transported to and placed at a contractor furnished, State permitted upland placement site(s). The proposed maintenance dredging would remove approximately 187,260 cubic yards (CY) of selected critical shoals from the Main and Port Elizabeth Channels of Newark Bay. Dredging in these channels would be required to a depth of -50 feet Mean Lower Low Water (MLLW) plus 1 foot allowable overdepth. The dredged material is expected to consist primarily of silt and clay.he work is estimated to cost between $10,000,000 and $25,000,000.
Posted Date: April 13, 2018
Due/Archive Date:-
Nation: the U.S.
Contracting Authority: Department of the Army, U.S. Army Corps of Engineers
Contracting Office Address:Attn: CENAN-CT 26 Federal Plaza New York, New York 10278-0090
United States
Point of Contact(s):Justin Helfman justin.helfman@usace.army.mil
Phone: 9177908389
Nicholas P. Emanuel P.Emanuel@usace.army.mil
Phone: 9177908069
The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier.