Nullah Leh Dredging Work Is Coming to An End

2017.06.09

The work on dredging of Leh was commenced in April this year at a total cost of Rs25 millions which was allocated by the Punjab government.

Though works on all channels connecting with the main channel have been finished while the remaining work on Leh dredging at Dhok Ratta and Gawalmandi channels would be completed within next 10 days.

The dredging cross sections of Nullah Leh have been deepened by 450 inches in order to make the smooth flow of water during Monsoon rains this season.

The news is collated by Globaldredge.com – Dredging Pipeline Supplier.

Freeport of Riga Dredging Works

2017.06.08

Tender Ref No: 202567-2017

Tender Details: Open Procedure

Work Profile: Contract for carrying out dredging works in the Freeport of Riga water area for the years 2017-2019. The works are to be carried out using a Trailing Suction Hopper Dredger (TSHD). The procurement documents are available for unrestricted and full direct access with free charge.

Project Stage: Tenders Invited

Project Period: 30 Months

Value: 18,000,000 EUR

Area: Latvia, Riga

Posted Dated: 07/06/2017

Tender Deadline: 29.6.2017 – 10:00 hrs

Promoter: Rigas Brivostas parvalde, 90000512408, Kalpaka bulv. 12, Riga, 1010, Latvia

Contact: Arnis Smits
Tel: +371 29246774
E-mail: info@rop.lv
Fax: +371 67030835

The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier.

Ship Channel Pipeline Dredging Project

2017.06.06

Solicitation No.: W9126G-17-B-0001

Notice Type: Solicitation

Work Description:
The project is planing to perform maintenance pipeline dredging of approximately 1316000 cubic yeards in the Main Channel and Main Turning Basin with an Option for approximately 77,000 cubic yards. The dredge material for the Option will be placed in SPPA 2. Completion time for Schedule No. 1 is 110 calendar days.

Posted Date: June 5,2017

Due Date: N/A

Nation: USA

Contracting Office Address:
Attn: CESWF-CT
PO Box 17300
Fort Worth, Texas 76102-0300
United States

Place of Performance:
Galveston County, Texas
Galveston, Texas 77550
United States

Contact:
Lucille R. Smith,
Contract Specialist
lucille.r.smith@usace.army.mil
Phone: 4097663845

The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier.

Harwich Maintenance Dredging

2017.05.25

Tender Ref No: 184890-2017

Tender Details: Open Procedure

Work Profile: Maintenance dredging in Harwich and Felixstowe, disposal to sea and sites in the harbour; Small scale plough and agitation dredging.
Lot 1: Harbour Works: Dredging maintenance work is to remove approximate 1,200,000m3 (in-hopper) from harbour berths and approaches.
Lot 2: Sediment placement works is to dredge approximate 100,000m3 (in-hopper) of maintenance silt and dispose of in sediment placement sites in the Harbour.
Lot 3: Minor Works: Deployment of water injection or other approved equipment for dredging in shallow areas including marina channels, areas of restricted access and around and under pontoons.

Project Stage: Tenders Invited

Project Period: 01/01/2018 – End: 31/12/2021

Value: £24,000,000

Area: UK

Posted Dated: 24/05/2017

Tender Deadline: 14.7.2017 – Noon

Promoter: Harwich Haven Authority, Harbour House, The Quay, Harwich, CO12 3HH

Contact: John Brien
Tel: +44 1255 243030
E-mail: harbour.engineer@hha.co.uk

The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier.

Dredging Project of Delaware River Main Channel

2017.05.19

Solicitation Number: W912BU-17-B-0009

Notice Type: Solicitation

Work Description:
Dredging shall be required to a depth of 45 feet below MLLW (47 feet below MLLW from approximately Station 119+500 to Station 128+500) plus 1-foot allowable over depth within the contract work limits.
The total estimated dredging quantity is 4.0 million cubic yards with approximately 1.5 million cubic yards in the base contract and 2.5 million cubic yards in Options.
All work and services in the base contract and Option 1 shall be completed no later than December 31, 2017; all work and services in Option 2 shall be completed no later than December 1, 2018.

Posted Date: May 18, 2017

Archive Date: June 15, 2017

Nation: USA

Contracting Office Address:
100 Penn Square East
Wanamaker Bldg (RM 643)
Philadelphia, Pennsylvania 19107-3390
United States

Place of Performance:
Pennsylvania
United States

Primary Point of Contact.:
Robert R Hilton
robert.r.hilton@usace.army.mil
Phone: 2156566911

The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier.

Dredging Work from Philadelphia to Trenton, Deleware River

2017.05.16

Solicitation No.: W912BU-17-B-0014

Notice Type: Presolicitation

Tender Value: $27.5 Million

Work Description:
Contract will consist of maintenance dredging within the project channel of the Fairless Turning Basin. Dredging will be required to a depth of 40′ MLLW plus 1′ allowable overdepth and a distance of 25′ outside the three remaining turning basin edges. In addition, the dredging work must be accomplished by hydraulic pipeline dredge only. Due to environmental restrictions, dredging must occur from 15 July 2017 to 31 December 2017.

Posted Date: May 15,2017

Archive Date: June 13, 2017

Nation: USA

Contracting Office Address:
100 Penn Square East
Wanamaker Bldg (RM 643) Philadelphia, Pennsylvania 19107-3390

Place of Performance:
Maintenance Dredging; Delaware River Philadelphia Pennsylvania to Trenton, New Jersey

Contact:
Joseph R. Manney
joseph.r.manney@usace.army.mil
Phone: 2156566763

The tender information is collated by Globaldredge.com – Dredging Pipeline Supplier.