Banana River Channel Maintenance Dredging Contract
Solicitation Number: NNK16594696R
Notice Type: Award
Contract Award Date: November 7, 2016
Contract Award Number: NNK17CA10C
Contractor Awarded Name: Florida Dredge & Dock, LLC
Contract Award Dollar Amount: $5,945,000.00
Work Description: The primary task of the construction / dredging firm will be maintenance dredging of the Banana River channel. The work includes maintenance dredging to remove approximately 200,000 cubic yards of material from a 2 mile-long, 125 feet wide section of the Banana River channel to restore the depth of the channel to -13.0 feet Mean Water Level (MWL). The permitted depth is -12.0 feet MWL, plus one foot allowable overdepth to -13.0 feet MWL. The current average depth of the section of channel to be dredged is -10.0 feet MWL. For hydraulic dredging, the distance to the existing spoil site will be 4 miles away at the farthest point, and 2 miles away at the closest point to the section of channel to be dredged.
The news is collated by Globaldredge.com – Dredging Pipeline Supplier.